References

lijn

  • Maastunnel
  • Zeetoegang IJmuiden
  • SAA projectoverzicht A1
  • Ontwerp Fietsbrug SAA project
  • Ramspolbrug vanaf Emmeloord gezien
  • Ramspolbrug vanaf Kampen gezien
  • Viaduct Schokkerringweg over N50 bij Ens
  • Sluis
  • Uitbouw woning
  • Uitbouw woning
  • Groene Hart Tunnel - Vluchtschacht
Current Project
Year Client Project View
2016 Mobilis/TBI Maastunnel - City of Rotterdam
The Maastunnel connects the North and South sides of the city of Rotterdam. With 75 years open it's the oldes sunken tunnel in the Netherlands and it needs to be renovated/restored.
During the tender phase I was hired to make fasing drawings to show the works and a timeline to convince the ordering party Mobilis could do the job.
It helped as they were the chosen contractor for this project.
Currently I am contracted again to assist the preparation department by making drawings and images for work plans.
Selection of completed projects
Year Client Project View
2012 ~ 2014 Volker InfraDesign Expansion of motorways A1 and A6 from Diemen (near Amsterdam) to Almere. This expansion is part of the expansion of motorways between Schiphol Airport, Amsterdam and Almere (SAA).
Works performed (sorted from most recent):
  • Landscaping (refer to the link on the right);
  • Design and maintain a management tool with all project related external reference drawings (xrefs);
  • Standard details applicable to all structures;
  • Design and monitoring of the drawing template with regard to document control
SAA project area




 
2010 .. 2012 Volker InfraDesign Reconstruction road N50 Ramspol Ens
Bridge over the Ramspol
  • Concluding works; as built drawings showing field changes
  • Works design - Details bridge deck objects like portals, barriers, lampposts. Details transition bridge movable part to fixed part.
  • Works design - Detailed design of expansion and fixed joints, including rebar details.
  • Works design - Handrails, skirts, several details in and round counterweight building.
  • Detailed design - Bridge deck with inserts
Viaduct near Ens
  • Concluding works; as built drawings showing field changes
  • Works design - landing, middle console, slope cover, side elements and hand rail
  • Detailed design and major details
  • Provisional design
  • Artist Impressions
Footage bridge (600x450 30 Mb)

Footage bridge (800x600 39 Mb)

view Viaduct
2011 Combinatie CrommeLijn
Spoorzone Delft
3D phasing Railway Station Delft
Works drawings
 
Jun '08
~
Mar'10
Volker Staal en Funderingen (VSF) Electrabel Maasvlakte - New coal fired power plant
Drawings: Sheetpile boxes, strutting, anchoring, excavation plans, piling plans, progress plans
 
Jul '09
~
Feb '10
C.V. De Keiebijters New home C.V. De Keiebijters
- General arrangement and elevations
- 3D design and animation
view animation
Feb
~
Mar '09
Individual Works drawing raised terrace
- Steel works with stairs
- Piling plan
Jan
~
Apr '09
Volker Staal en Funderingen (VSF) Work island Westerschelde
- Work island to establish connection of bored gas pipe
- Double sheetpil box with horizontal anchoring and strutting at 4 meter below sea level
 
Feb '08
~
Jul '08
Volker Staal en Funderingen (VSF) Replacing railway bridges Leerdam  
Oct '07
~
Jul '08
Volker Staal en Funderingen (VSF) Isle of Grain (UK)
- works drawings new sea jetty
 
Jul
~
Oct 2007
Individual Permit home improvement Voorhout
- Complete rebuilding existing home with extension at the rear
Mar 2007 Restaurant Lambermons Safety plan for fire-brigade
Jan
~
Nov 2007
Volker Staal en Funderingen (VSF) Esso Nederland BV
- Works drawings extension combined sea and inland jetty
 
Oct 2006
~
Jul 2008
Van Splunder Funderingstechniek (VSF) Project: Amsterdam Oiltanking
- Works drawings combined sea and inland jetty with piping to storage tanks
 
Aug 2006
~
May 2007
DMN Westinghouse 3D models of rotary valves
May
~
Jul 2006
Van Splunder Funderingstechniek (VSF) Stena Line Hoek van Holland
- Works and shop drawings for extension of mooring 1
 
Apr
~
Jun 2006
Van Splunder Funderingstechniek (VSF) Kuwait Petroleum Europoort
- Works drawings modification of Jetty I, II and IV
 
Jan/Mar 2006 Private owner Permit drawing home improvement Noordwijkerhout:
- rear extension by 2,5 mtr
Jun
~
Aug 2005
Private owner Permit drawing home improvement Noordwijk:
- Extension of kitchen at rear and aside
Mar
~
Dec 2005
Bouygues TP Groene Hart Tunnel
- As Built drawings;
- Landscaping drawings;
- Permit drawings;
- Artist Impressions;

lijn